Bulk excavation works (circa 15,000 cubic metres) in preparation for the construction of the new Lismore base Hospital extension. In addition to the bulk excavation, the scope included multiple service trades such as the construction of a new stormwater line and detention tank, in-ground electrical and gas services and construction of concrete ground slabs/pavements.