Demolition of existing site improvements (shopping centre precinct – brick/concrete structures up to 4 storeys high) including hazardous materials removal, bulk excavation (circa 32,000 cubic metres), design and construction of a full perimeter site retention system (piling, anchoring, shotcrete walls and capping beams.